Chemical & Fertiliser Fertiliser granulation line: screening and conveying
A typical fertiliser granulation line: corrosive, moisture-absorbing material, finished-product screening with belt and bucket elevator conveying, and the parts and maintenance points that follow.
Cement & Building Materials River Gravel Sand Making: VSI Cutting Heads and Chamber Choice
On a river gravel VSI sand line for concrete and dry-mixed mortar, the cutting head, the matched rotor parts and the cavity liners are one wear group. Chamber type is picked by gradation.
Cement & Building Materials Limestone crushing in cement plants: hammers and grate bars
Limestone primary crushing in a cement plant runs a hammer crusher three shifts a day. Here is how the wear parts are selected and when to change the hammers.
Power & Metallurgy Slag Processing: Hydraulic Cone Crusher Wear Parts
Wear parts for multi-cylinder hydraulic cone crushers in slag processing. Liners, eccentric bushings, main shaft and hydraulics, plus three field points on liner life and iron protection.
Mining & Aggregates Granite secondary crushing: blow bars and feed control
In granite secondary crushing, blow bar life depends on material selection and on the feed. A look at the wear parts that should be replaced as a set.
Mining & Aggregates Copper Ore Primary Crushing: Jaw Plate Life and Selection
In a copper concentrator's primary crushing circuit, PE series jaw plates last about 2 years in soft rock and 6 months to 1 year in hard rock. How to plan the change.
YOUR LINE NEXT?
Bring us the part that fails first.
Every line has one. Send us its name, your machine model and your material — we will tell you what we would cast instead.